Pool Opening Preparation Guide
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Above Ground Pool Opening

What We Do
- During your pool opening, the following items are included:
- Pool cover removal and storage
- Reinstall ladder and handrails
- Remove suction and return line plugs
- Initial chlorine shock treatment with up to 2 gallons of liquid chlorine
- Setup and check the filtration system
- Test water chemistry

What We Do Not Do
- The following is NOT included in our pool opening service:
- Our technicians will not be moving equipment up or down stairs (i.e. out of attics or basements)
- If your equipment is stored up or downstairs, please ensure it has been moved to the top/bottom of the stairs before our arrival
Opening Extras
We serve these areas of Long Island, NY.
We serve these areas of Long Island, NY.
We serve these areas of Long Island, NY.
What You Need To Do Before We Arrive
Add water to the pool
The pool will need to be filled up to the middle of the skimmer so that we can start up the system and test for any issues or leaks
Turn on electricity
The pool will need to be filled up to the middle of the skimmer so that we can start up the system and test for any issues or leaks
Be sure we have access to stored equipment and the equipment pad
The pool will need to be filled up to the middle of the skimmer so that we can start up the system and test for any issues or leaks
Be sure solid covers are free of water and debris
The pool will need to be filled up to the middle of the skimmer so that we can start up the system and test for any issues or leaks
What You Need To Do After We Leave
Maintain your chemical levels
The pool will need to be filled up to the middle of the skimmer so that we can start up the system and test for any issues or leaks
Backwash your filter
The pool will need to be filled up to the middle of the skimmer so that we can start up the system and test for any issues or leaks
Vacuum the Pool
The pool will need to be filled up to the middle of the skimmer so that we can start up the system and test for any issues or leaks
Have a maintenance plan for the season
The pool will need to be filled up to the middle of the skimmer so that we can start up the system and test for any issues or leaks
Inground Pool Opening

What We Do
- During your pool opening, the following items are included:
- Pool cover removal and storage
- Reinstall ladder and handrails
- Remove suction and return line plugs
- Initial chlorine shock treatment with up to 2 gallons of liquid chlorine
- Setup and check the filtration system
- Test water chemistry

What We Do Not Do
- The following is NOT included in our pool opening service:
- Re-install diving boards - Due to increased liability risks, we have decided to no longer offer this service
- Our technicians will not be moving equipment up or down stairs (i.e. out of attics or basements)
- If your equipment is stored up or downstairs, please ensure it has been moved to the top/bottom of the stairs before our arrival
Opening Extras
We serve these areas of Long Island, NY.
We serve these areas of Long Island, NY.
We serve these areas of Long Island, NY.
We serve these areas of Long Island, NY.
What You Need To Do Before We Arrive
Add water to the pool
The pool will need to be filled up to the middle of the skimmer so that we can start up the system and test for any issues or leaks
Turn on electricity
The pool will need to be filled up to the middle of the skimmer so that we can start up the system and test for any issues or leaks
Be sure we have access to stored equipment and the equipment pad
The pool will need to be filled up to the middle of the skimmer so that we can start up the system and test for any issues or leaks
Be sure solid covers are free of water and debris
The pool will need to be filled up to the middle of the skimmer so that we can start up the system and test for any issues or leaks
What You Need To Do After We Leave
Maintain your chemical levels
The pool will need to be filled up to the middle of the skimmer so that we can start up the system and test for any issues or leaks
Backwash your filter
The pool will need to be filled up to the middle of the skimmer so that we can start up the system and test for any issues or leaks
Vacuum the Pool
The pool will need to be filled up to the middle of the skimmer so that we can start up the system and test for any issues or leaks
Have a maintenance plan for the season
The pool will need to be filled up to the middle of the skimmer so that we can start up the system and test for any issues or leaks
Get your customized pool maintenance package proposal today